Waterfall Way survey …

As you are aware, heavy vehicle traffic on Waterfall Way has increased over recent months and is due to increase even more as the construction of the Urunga bypass ramps up.  This presents a safety and quality of life issue for the broader community.  People with an Interest in Road Safety for Waterfall Way – is therefore seeking feedback from business owners and residents located along Waterfall Way.

The Working Group is delivering the attached survey and where possible talking to businesses which might be directly affected by the increased traffic.  Delivery of the surveys should be completed before Christmas and we are asking people to respond either by email, or by dropping their completed survey in to Polly at the IGA by 31st December 2014.

Please use the attached survey if you do not receive a copy in your letterbox, or if you know of someone who has been affected by the increased traffic.

Waterfall Way Survey December 2014

Waterfall Way Survey December 2014

Waterfall Way Survey December 2014